EV Charger Installation in Shortlands
An Ohme ePod smart charger, a £500 OZEV grant and off-peak charging at just 7p per kWh, cutting energy costs for charging by around 77% for a Shortlands customer.
- Case Study, Shortlands
Smart Home Charging, Fully Handled
This project saw us install an Ohme ePod smart EV charger on a private driveway in Shortlands, Bromley, along with a new distribution board and all associated cabling.
As OZEV-registered installers, we secured a £500 government grant on the customer’s behalf and managed every application along the way, so all they had to do was plug in.
- The System
What Went Into This Installation
Every part of this installation was planned to give the customer a safe, compliant and cost-effective charging setup, from the consumer side of the supply right through to the charger on the driveway.
- EV charger: Ohme ePod smart charger
- Electrical upgrade: New distribution board
- Infrastructure: All associated cabling and containment
- Charging setup: Timed, off-peak charging schedule
- Funding: £500 OZEV government grant
- Performance & Savings
Charging for 77% Less
By scheduling charging to run during off-peak hours, the customer now pays just 7p per kWh to charge their vehicle instead of the 30p peak rate. That’s a saving of around 77% on every unit of energy used for charging, on top of the £500 grant taken off the installation cost.
- £500 — OZEV grant secured
- 7p/kWh — Off-peak charging rate
- 77% — Saving on charging costs
- How It Works
Smart Charging, Set and Forget
The Ohme ePod is configured to charge on a timed, off-peak schedule, so the car tops up overnight when electricity is at its cheapest. The customer simply plugs in when they get home and the charger takes care of the rest.
Because charging happens outside peak hours, the customer gets a full battery each morning without paying peak-rate prices for it.
- Installation & Certification
Hassle-Free From Start to Finish
Every stage of this installation, from the new distribution board and cabling to the charger itself, was completed, fully commissioned and certified to recognised industry standards.
We also handled the paperwork that often holds EV installations up: the DNO application to the local network operator and the OZEV grant application, both submitted and managed on the customer’s behalf. As OZEV-registered and NICEIC-certified installers, compliance is built into how every job is planned from day one.
- Our Reviews
What Bromley, Kent & London Think of Us
Real feedback from homeowners and businesses we’ve installed for, certified work, straightforward service.
- Get Started
Want Results Like This for Your Own Home?
Book a free survey and we’ll assess your property, supply and parking setup for an EV charger. We’ll handle the grant, the DNO application and the installation, the same way we did for this Shortlands customer.