Commercial Intake Relocation in Green Park

The relocation of a UKPN main intake for a residential block of around 120 flats in Green Park, London, with new switchgear, a Ryefield distribution board and surge protection for the whole building.

Home

→

Projects

→

Case Study, Green Park

Case Study, Green Park

Relocating the Supply for Around 120 Flats

This archive project covers the relocation of a UKPN main intake supply for a residential block of around 120 flats in Green Park, London. We installed new switchgear and a Ryefield distribution board to bring new supplies from the relocated main intake through to the existing Ryefield equipment in the centre of the building.

Get My Free Quote ›
New main switch and distribution board at the relocated intake, Green Park
Supply route: relocated UKPN main intake, new main switch, tray and containment, Ryefield distribution board serving around 120 flats, with Type 1 + 2 SPD

Scope of Works

What Went Into This Project

We installed new tray and containment along the full length of the basement, along with a new localised main switch and Ryefield distribution board to receive the relocated supply. The distribution board serves both the individual flats and the landlord’s supplies for the building.

✓

Supply: Relocated UKPN main intake

✓

Switchgear: New localised main switch

✓

Containment: New tray along the full length of the basement

✓

Distribution: Ryefield board for the flats and landlord’s supplies

✓

Protection: Combined Type 1 and Type 2 SPD

Get My Free Quote ›

Protection & Bonding

Protecting the Whole Building

A combined Type 1 and Type 2 surge protection device, or SPD, was installed to protect the whole building. We also carried out earth bonding on the incoming gas and water services as part of the works.

✓

Type 1 + 2 — Combined surge protection device

✓

Gas — Incoming service earth bonded

✓

Water — Incoming service earth bonded

Get My Free Quote ›
Wayre House electrician installing switchgear and cable tray at a Green Park residential block
New tray, containment and main switch in the basement intake room, Green Park

Coordination

Working Directly With UKPN

We organised the relocation of the main intake directly with UKPN, the distribution network operator, arranging a supply shutdown planned to cause as little disruption to residents as possible.

Get My Free Quote ›

Our Reviews

What Bromley, Kent & London Think of Us

Real feedback from homeowners and businesses we’ve installed for, certified work, straightforward service.

Get Started

Need Work Like This on Your Building?

Book a free survey and we’ll assess your building’s supply, switchgear and distribution. We’ll coordinate with the network operator and handle the installation, the same way we did for this Green Park residential block.

Get My Free Quote ›